BAC PCE Operating And Maintenance Instructions Manual page 27

Table of Contents

Advertisement

1. To remove the combined inlet shields, lift each section and pull at the lower end.
Remove combined inlet shields
2. The supporting steel strip does not need to be reinstalled because it is only required for safe transport
purposes.
3. Make sure the profile of the combined inlet shields keeps the water inside the unit. The correct position is with
the horizontal part towards the outside of the unit and the sloping part facing downwards to the inside of the
unit.
Orientation of the combined inlet shield
FAN SHAFT
The exposed areas of the fan shaft are coated with a soft seal for added corrosion protection. It is recommended
that the coating be inspected for continuity quarterly or at least every 6 months. Any signs of surface corrosion
must be treated. This involves:
1. Removal of the protective coating with a suitable cleaning medium.
2. The removal of any surface corrosion with emery cloth.
3. The re-coating of the shaft with soft seal.
5 Maintenance Procedures
5 Maintenance Procedures
W W W . B A L T I M O R E A I R C O I L . E U
27

Advertisement

Table of Contents
loading

Table of Contents