1.2.2 POWER THE SUPERVISOR
Domestic / Mains
Solar with external battery
Solar without external battery
TABLE 2: Cellular Gateway Supervisor Battery Switch Options
FIGURE 2: Battery Switch
FIGURE 3: Battery Detail
1.2.3 SEAL THE SUPERVISOR
1.
2.
3 | QUICK START GUIDE | GEOKON
Cellular Gateway Supervisors:
Move the battery switch to either
Connect to external DC power, then proceed to Section 1.2.3.
For solar panel information, Appendix F in the
Power Source
Cellular Gateway Supervisor
Non-cellular Supervisors:
Move the battery select switch to either the
type of battery being used.
Align the positive (+) side of the batteries with the + indicator in the battery holder. Push the
batteries straight down into the holder.
Place the supplied desiccant packs inside the enclosure.
Ensure the cover gasket and the mating ridge on the enclosure are clean, and that the
gasket is properly seated inside the groove on the cover. Place the cover on the unit.
setting or to
9-24V
BATTERY
Instruction
Manual.
Air Temp Less Than 0 °C
9-24V
9-24V
N/A
or
ALKALINE
LITHIUM
, according to the chart below.
Air Temp Greater Than 0 °C
BATTERY
N/A
BATTERY
Non-cellular Supervisor
position depending on the
2:
2:
3: