Riello Burners RG4S Installation, Use And Maintenance Instructions page 23

Oil burner, one stage operation
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 21
3.
INSTALLATION
3.1 BOILER FIXING
Put on the flange (1) the screw and two nuts, (see fig. 3).
Widen, if necessary, the insulating gasket holes (4), (see fig. 4).
Fix the flange (1) to the boiler door (3) using screws (5) and (if necessary) the nuts (2) interposing the
insulating gasket (4) , (see fig. 2).
After installation ensure that burner is lightly inclined as in fig. 5.
Fig. 2
Fig. 3
3.2 FUEL SUPPLY
The burner is designed to allow entry of the oil supply pipes on either side.
Depending on the oil supply pipes position (to the right or to the left hand side of the burner) the fixing plate
(1) and closing plate (2) should be reversed, (see fig. 6).
1
2310
Fig. 6
2
D5530
3
GB
D5012
Fig. 4
S7071
D5025
Fig. 5
1

Advertisement

Table of Contents
loading

This manual is also suitable for:

396 t13739650

Table of Contents