Download Print this page

Required Tools And Materials; Installation - Siemens MEC 1100 Installation Instructions Manual

Modular equipment controller

Advertisement

Document No. 586-146
Installation Instructions
July 30, 2008
BACnet MEC Models
549-630 PWR MEC Model 1100EB I/O (HOA Ready)
549-631 PWR MEC Model 1110EB I/O HOA
549-632 PWR MEC Model 1200EB I/O PB (HOA Ready)
549-633 PWR MEC Model 1210EB I/O PB HOA
The following BACnet models also provide P1 FLN
ports or an MS/TP FLN port and 72 MB of memory:
549-634 PWR MEC Model 1200EFB I/O PB FLN (HOA
Ready)
549-635 PWR MEC Model 1210EFB I/O PB FLN HOA
The following BACnet models also provide a
L
W
FLN port and 72 MB of memory:
ON
ORKS
549-636 PWR MEC Model 1200ELB I/O PB LON (HOA
Ready)
549-637 PWR MEC Model 1210ELB I/O PB LON HOA
Warning/Caution Notations
WARNING:
Personal injury or property
damage may occur if you do
not perform the procedure as
specified.
CAUTION:
Equipment damage or loss of
data may occur if you do not
follow the procedure as
specified.

Required Tools and Materials

Wire stripper/side cutters
Phillips screwdriver
Level
Tape measure
Digital multimeter (DMM)
To mount on a surface
Electric drill
Black marker
Four No. 8 × 3/8 self-tapping Phillips screws
To mount on concrete or masonry
Masonry drill bit
Four lead wall anchors
If using HOAs for equipment control
before the MEC start-up
Analog point type information has been obtained
from the wiring diagram.
Electro-static discharge (ESD) wrist strap.
Page 2 of 6
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com
Expected Installation Time
20 minutes
NOTE: Additional tasks (for example, running power
wiring) may add to your installation time.
Refer to the estimating tool for more
information.
Prerequisites
All necessary wiring is pulled.
If mounting in an MEC or PX series enclosure
MEC or PX series enclosure installed.
Either the 115V or 230V service box kit
or the 192 VA or 384 VA service box
assemblies are installed, as applicable.
For more information on the MEC service box, see
the MEC Service Box Installation Instructions
(586-135).
For more information on the PX series enclosures,
see the 19" and 34" PX Series Enclosure
Assemblies Installation Instructions (553-130) or the
18" PX Series Enclosure Assembly Installation
Instructions (553-620).
For more information on the PX series service
boxes, see the PX Series Service Box Assemblies
Installation Instructions (553-131).

Installation

There are three options for installation:
For energy management only, you may mount
the MEC on a surface.
For smoke control applications, mount the MEC
inside an MEC enclosure.
For any application requiring a secure
enclosure, mount the MEC inside a listed
enclosure along with the matching Service Box
and Sidewall Kit, if needed.
CE Compliance Requirements
For installations requiring CE compliance, the MEC
must be installed inside a metal enclosure rated at
IP20 minimum.
See APOGEE Wiring Guidelines for Field Panels
and Equipment Controllers (125-3002) for CE
compliance wiring requirements.
Siemens Building Technologies, Inc.

Advertisement

loading

This manual is also suitable for:

Mec 1101Mec 1110Mec 1200Mec 1201Mec 1210Mec 1300 ... Show all