Materials And Tools Required - Siemens SIMATIC S7-300 Getting Started

Hide thumbs Also See for SIMATIC S7-300:
Table of Contents

Advertisement

Introduction
This guide takes you through 6 commissioning steps to set up a functioning application by
running through a concrete example. In this way you will get to know the basic hardware and
software functions of your S7-300.
You should expect to spend approximately 1.5 to 2 hours on this example, depending on the
level of your experience.
Prerequisites
The following prerequisites must be fulfilled:
You must be familiar with the fundamentals of electronic/electrical engineering and have
experience of working with computers and Microsoft
The reference potential must be grounded. That means that the bridge between chassis
ground and functional ground must be installed (which is how the CPU is shipped).
Warning
!
The S7-300 is used as a component in installations and systems that require you to comply with
specific rules and regulations that vary depending on the application. Please note the relevant
safety and accident-prevention regulations, such as IEC 204 (emergency stop systems).
Non-compliance with these regulations can result in serious injury and damage to both machinery
and equipment.

Materials and Tools Required

Quantity
1
Rail
1
PS 307 power supply (PS) with power connector (VK)
1
CPU 314
1
Buffer battery
1
Digital input module (DI) with bus connector
1
Digital output module (DO) with bus connector
2
20-pin front connector with screw-type contacts
1
Programming device (PG) with MPI interface and installed STEP 7 ver-
sion
5.0 and PG cable
X m
PROFIBUS-DP cable with bus connectors
Various
M6 screws and nuts (length depends on installation location) with appro-
priate screwdriver/wrench
1
Screwdriver with 3.5 mm blade
1
Screwdriver with 4.5 mm blade
1
Diagonal cutter and tool for insulation stripping
1
Tool for pressing on wire-end ferrules
X m
Cable for grounding the rail with 10 mm
M6, length dependent on local requirements
Approx.
Stranded wire with 1 mm
2 m
les (type A, length 6 mm)
X m
3-core power cable (AC 230/120 V) with shock-proof plug; length depen-
dent on local requirements; correct wire-end
2
1-pin on switch (24 V)
2
Item
2
2
cross-section with appropriate wire-end ferru-
S7-300 Programmable Controller, Getting Started, First Steps for Installation and Commissioning
Windows
cross-section with cable lug for
95/98/NT.
Order Number (SIEMENS)
e.g.: 6ES7 390-1AE80-0AA0
e.g.: 6ES7 307-1EA00-0AA0
e.g.: 6ES7 314-1AE04-0AB0
6ES7 971-1AA00-0AB0
e.g.: 6ES7 321-1BH01-0AA0
e.g.: 6ES7 322-1BH01-0AA0
6ES7 392-1AJ00-0AA0
Depends on configuration
Depends on type
Standard
Standard
Standard
Standard
Standard
Standard
Standard
Standard
Standard
A5E00069340 01 // 04/2000