9
INSTALLATION
AS FALL-THROUGH PROTECTION SYSTEM IN ACCORDANCE WITH EN 1263-1
AND
ANCHORAGE DEVICE ACCORDING TO EN 795:2012 TYP B
Place net over the light dome:
1
-
Spread the net (MOBI) at a safety distance of at least 2 m from the light dome
(fall opening).
-
ATTENTION! LABOUR PROTECTION LAWS REQUIRE THAT YOU BE
SECURED WHEN APPROACHING A LIGHT DOME!
-
Lift the net at the two grab handle loops.
-
After securing yourself, carefully approach the light dome holding up the net
and cast it over the light dome.
Tie down the net:
2
-
Connect the harness strap all around the light dome and disentangle it.
-
Tighten the tension strap and close it carefully.
-
When the tension strap is closed, it must be ensured that at least 3 rotations of
the strap are wrapped around the tension pulley.
-
When tightening the anchorage device, you must tighten the strap in such a way
that a flat hand will fit between light dome and harness strap.
-
When the strap has been tightened, the MOBI fall prevention system is ready for
implementation.
-
When you are finished using the harness strap, you can open it again by releasing
the lever.
Hooking the carabiner when using the system
3
as an anchorage device (EN 795:2012 TYP B)
-
Hook the carabiner into the harness strap and the thick strap
of the net.
-
Use only as an anchorage device if the light dome is attached as required
by standard and has been sealed.
The fastener (e.g. carabiner hook) of the personal protective equipment (PPE)
may only be hooked into the professionally closed tension belt.
ATTENTION ! When using the system as an anchorage point, check repeatedly
if the tension belt has been installed and tied down professionally as required
by the instructions for installation and use.
10
MOBI / Version 1.5 / www.innotech.at
Need help?
Do you have a question about the MOBI and is the answer not in the manual?
Questions and answers