Advertisement

Concept III-700
40011626-1551 Concept III-700 ENG

Advertisement

Table of Contents
loading

Summary of Contents for Faber Concept III-700

  • Page 1 Concept III-700 40011626-1551 Concept III-700 ENG...
  • Page 2 I n s t a l l a t i o n I n s t r u c t i o n s...
  • Page 3 I n s t a l l a t i o n I n s t r u c t i o n s 1.7a 1.7b...
  • Page 4 I n s t a l l a t i o n I n s t r u c t i o n s...
  • Page 5 I n s t a l l a t i o n I n s t r u c t i o n s...
  • Page 6 I n s t a l l a t i o n I n s t r u c t i o n s...
  • Page 7: Safety Instructions

    Applicable EC directives: 2009/142/EC Harmonised standards applied: NEN-EN-613 and NEN-EN-613/A1 Congratulations on your purchase of a Faber fire! A quality product from which you will experience warmth and ambience for many This declaration will become null and void as soon as the unit is in years.
  • Page 8: Preparation And Installation Instructions

    • Always use the supplied discharge materials for the supply Take the installation requirements into account (see Chapter 3). and discharge ducts. Only with use of these materials Faber can guarantee proper performance. • First, determine the desired height of the platform and then •...
  • Page 9: Removing The Glass

    I n s t a l l a t i o n I n s t r u c t i o n s 5 Removing the glass • Check that the pilot flame is well above the main burner and not covered by chips or a wood block.
  • Page 10: Annual Maintenance

    I n s t a l l a t i o n I n s t r u c t i o n s 8 Instructions for client • Recommend that the unit should be checked annually by a qualified specialist to ensure the safe use and to guarantee a long service life.
  • Page 11: Technical Data

    I n s t a l l a t i o n I n s t r u c t i o n s Technical data II2H3+ II2H3+ II2H3+ Gas category Type appliance C11/C31/C91 C11/C31/C91 C11/C31/C91 Reference gas Input Hi Efficiency class NOx-class Inlet pressure...
  • Page 12 I n s t a l l a t i o n I n s t r u c t i o n s Outlet position > Please note: These rules apply only for the proper functioning of the unit, for ventilation and environmental protection you need to comply with the applicable rules as defined in the building Act.
  • Page 13: Support List

    I n s t a l l a t i o n I n s t r u c t i o n s Support list - See inst. manual. - Learn a new code for remote. Light the pilot flame with - 1x 9V Alkaline.
  • Page 14 I n s t a l l a t i o n I n s t r u c t i o n s - Check the complete - Short circuit in the Pilot stays lit wiring of thermocouple thermocouple circuit. circuit.
  • Page 15 I n s t a l l a t i o n I n s t r u c t i o n s - RESET the receiver Optional: - Repaire the wiring. - Check the wiring from Step burner function can solenoid valve to receiver.
  • Page 16: Dimensional Drawings

    I n s t a l l a t i o n I n s t r u c t i o n s Dimensional drawings 14.1 Concept III-700...
  • Page 17 I n s t a l l a t i o n I n s t r u c t i o n s 14.2 Position gass connection...
  • Page 18 I n s t a l l a t i o n I n s t r u c t i o n s 14.3 Holes template A = Mounting holes for wall mount B = Hole for wall duct C = Mounting hole for false chimney breast D = Position of gas tap...
  • Page 19 I n s t a l l a t i o n I n s t r u c t i o n s...
  • Page 20 Dealerinfo: www.faber.nl info@faber.nl Saturnus 8 NL - 8448 CC Heerenveen Postbus 219 NL - 8440 AE Heerenveen...

Table of Contents