For eQCM flow systems, insert the
connection to a peristaltic pump. The
connection is a very snug fit.
i.
Carefully slide the plastic tubing
onto the platinum tube. This can
be a very snug fit.
You may also
connect the plastic tubing to the
Pt tube before the assembly is
mounted onto the main block (see
11. Retest if the quartz crystal is mounted properly as shown in step 8. If it is not, you must remove
and readjust the quartz crystal.
12. Start any optional temperature-control system and optional flow system. Run your experiment.
Cell Connections--Quartz Crystal Installation
32