Chapter 4: Installation; Initial Visual Inspection - Gamry Instruments eQCM 10M Operator's Manual

Impedance scanning electrochemical quartz crystal microbalance
Hide thumbs Also See for eQCM 10M:
Table of Contents

Advertisement

Chapt
ter 4:
This chapt
ter of the Gam
mry Instrumen
the instru
ment.
Initial V
Visual Ins
spection
After you
remove your
eQCM 10M f
you find a
any damage, p
please notify
shipping c
container for
possible insp
Wa
rning:
"hazard
ous live" volta
ages in the in
in shipm
ment. Do not o
operate dama
safety. T
Tag a damage
ed eQCM 10M
Cautio
on:
winter c
conditions) to
the instr
rument, possi
ibly creating a
10M, all
ow at least o
ne hour for th
I
Installation--I
Installa
ation
nts Inc. eQCM
View of
from its shipp
Gamry Instru
ection by the
The "
"reinforced in
strument can
aged apparat
M to indicate t
If the eQC
CM 10M is ta
a warm, hum
mid location, w
a hazardous c
he instrument
Initial Visual I
Inspection
M 10M Opera
ator's Manual
Fi
igure 2 - 1
f an eQCM 1
0M
ping carton, ch
heck it for any
ments, Inc. an
nd the shippin
e carrier.
sulation" that
t keeps the op
n be rendered
ineffective if
us until a qua
alified service
that it could b
be a safety ha
ken from a co
old location (f
water vapor co
ould condens
condition. Bef
fore connectin
t to warm up
to room tem
17
covers norm
al installation
y signs of shi
pping damag
ng carrier imm
mediately. Sav
perator from
accessing the
f the eQCM 10
0M is damage
technician ha
as verified its
azard.
for example, o
outdoors in
se on the cold
d surfaces ins
ng power to a
a "cold" eQCM
perature.
n of
ge. If
ve the
e
ed
ide
M

Advertisement

Table of Contents
loading

Table of Contents