Power-Up Test - Gamry Instruments eQCM 10M Operator's Manual

Impedance scanning electrochemical quartz crystal microbalance
Hide thumbs Also See for eQCM 10M:
Table of Contents

Advertisement

Installation--Power-Up Test

Power-Up Test

Before you make any other connections to your eQCM 10M, check that the instrument is at least
nominally functional.
One quick test is to turn on the eQCM 10M and watch the blue Power LED indicator on the front panel.
After connecting DC power to the instrument, turn on the Power switch to On.
The Power LED should illuminate and remain on.
The status of the other LED indicator is not important at this time.
20

Advertisement

Table of Contents
loading

Related Products for Gamry Instruments eQCM 10M

Table of Contents