Installing The Cable-Management Arm - IBM Power System S822 Installing Instructions

Table of Contents

Advertisement

Figure 8. Lift the release latches and push the server into the rack

Installing the cable-management arm

The cable-management arm is used to efficiently route cables so that you have proper access to the rear
of the system. Use the procedure to install the cable-management arm.
To install the cable-management arm, complete the following steps:
1. Ensure that you have the following parts.
Figure 9. Relative positions of the cable-management arm parts before assembly
2. The cable-management arm can be installed on either side of the server. For this procedure, it is
illustrated that you are installing it on the right side, while you are facing the server from the rear.
1
2
A
Support arm
B
Cable-management stop bracket
C
Mounting bracket
D
Cable-management arm
E
Extension bracket
Installing the IBM Power System S822 (8284-22A)
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

8284-22a

Table of Contents