Removing The Shipping Bracket And Connecting Power Cords And Power Distribution Unit (Pdu) For Your Preinstalled Server - IBM Power System S822 Installing Instructions

Table of Contents

Advertisement

1. Verify that you received all the boxes you ordered.
2. Unpack the server components as needed.
3. Complete a parts inventory before you install each server component by following these steps:
a. Locate the inventory list for your server.
b. Ensure that you received all the parts that you ordered.
Note: Your order information is included with your product. You can also obtain order
information from your marketing representative or the IBM Business Partner.
If you have incorrect, missing, or damaged parts, consult any of the following resources:
v Your IBM reseller.
v IBM Rochester manufacturing automated information line at 1-800-300-8751 (United States only).
v Directory of worldwide contacts website http://www.ibm.com/planetwide. Select your location
to view the service and support contact information.
Removing the shipping bracket and connecting power cords and power
distribution unit (PDU) for your preinstalled server
Before you set up a console, you must remove the shipping brackets and connect power cords.
To remove the shipping bracket and connect power cords, do the following:
1. Remove the six screws that secure the shipping brackets to the chassis.
Figure 17. Removing the shipping bracket from the rear of the chassis
Store the shipping bracket if you want to move your system at a later date.
2. Cable the server.
a. Plug the two power cords into the power supplies (A) and attach the cables to the handles on the
power supply using the Velcro straps (B).
Installing the IBM Power System S822 (8284-22A)
23

Advertisement

Table of Contents
loading

This manual is also suitable for:

8284-22a

Table of Contents