Installation
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
6
7
1
Preparing the Machine
No Parts Required
Procedure
1. Park the machine on a level surface, set the parking
brake, shut off the engine, and remove the key.
2. Disconnect the negative battery cable; refer to your
Operator's Manual.
3. Open the hood.
Description
No parts required
Wire harness
Cable tie
LED work light
Light channel
Work-light bracket
Spring washer
Hex-head bolt (5/16 x 3/4 inch)
Locknut (5/16 inch)
Light-channel-mount bracket
Hex-head bolt (1/4 x 2-3/4 inches)
Flat washer (1/4 inch)
Flange nut (1/4 inch)
Rocker switch
Work-light decal
Fuse (15 A)
Fuse decal
No parts required
No parts required
Qty.
–
Prepare the machine.
1
Route the wire harness.
8
3
2
1
6
4
Install the LED work lights.
4
4
4
4
4
1
Install the rocker switch.
1
1
Connect the wire harness to the
ground-block terminal and install the
1
fuse.
–
Connect the battery.
–
Test the LED work lights.
2
Routing the Wire Harness
Parts needed for this procedure:
1
Wire harness
8
Cable tie
2
Use