Download Print this page

Quilt EZ Perfect Stitch Assembly Instructions Manual page 13

Machine upgrade svp

Advertisement

Control Box
1. Tape the control box
template to the side of
the machine. (Right
from front.)
2. Use a hammer and
punch to mark the drill
points.
3. Use the power drill and
a #29 bit to drill the
points.
4. Use a #8-32 tap on the
drilled holes.
5. The frame is thicker
at the top right, and
needs to be drilled 1/2"
Mark with tape 1/2"
from the tip on the bit,
and drill into the frame
until the tape reaches
Page 13

Advertisement

loading

Related Products for Quilt EZ Perfect Stitch