Download Print this page

Step 3: Battery Management System - Biomark Submersible Battery Assembly & Installation

Advertisement

Step 3: Battery Management System

Observe the battery management system (BMS) located at the center of the battery pack entry
plate. This device maximizes the charging sequence for each 3.2 V cell within the submersible
battery pack. Each positive terminal of all (4) battery cells will connect to the BMS via labeled
(Red) wire. In addition, the negative (blue/black) wire will connect the BMS to the negative
terminal of battery #4.
QUICK START GUIDE
SUBMERSIBLE BATTERY INSTALLATION
Step 2: Install Battery Cells into the
Submersible Battery Box
For easy installation of battery cells into battery box,
tilt battery box vertically so opening is orientated
upward and label on outside of box is facing away
from you. Install battery cell #4 into bottom right
position of battery box (orientation is negative-
positive). Install battery cell #3 into bottom left
position of battery box (orientation is negative-
positive). Install Battery cell #2 into top right position
of battery box (orientation is positive-negative). Install
Battery cell #1 into top left position of battery box
(orientation is positive-negative).
TIP: Battery box is constructed for tight fit of each cell
within box, allowing batteries to drop into place is
acceptable. If you have trouble achieving proper
battery placement, please contact us.
3

Advertisement

loading