Download Print this page

Performance Verification - IDEAL 61-603 Technical Manual

Advertisement

PERFORMANCE VERIFICAITONS
Perform the following analysis, if the meter conforms to the limits listed in Table 1 the meter is functioning
correctly. If the meter does not conform to any of the listed limits the calibration procedure must be
performed.
Performance Verification Preparation
1. Turn on the Calibrator, allow calibrator to warm up. Temperature Stabilization
should be reached after 30 minutes.
2. Remove battery cover and using a calibrated meter to ensure the battery measures a minimum of 7.5V
DC. If the battery measures under 7.5V DC, replace the battery before beginning the performance test.
3. Input the values listed in Table 1
Table 1 Performance Verification
Function Setting
ACV 200
ACV 500
DCV 2
DCV 20
DCV 200
DCV 900
DCmA 2m
DCmA 20m
DCmA 200m
DC A 10
Ω 200
Ω 2K
Ω 20K
Ω 200K
Ω 2M
Form number TM61603
Input
190V AC@ 60Hz
400V AC@ 60Hz
1.900V DC
19.00V DC
190.0V DC
900V DC
1.900 mA DC
19.00 mA DC
190.0 mA DC
9.00 A DC
100.0
1.000K
10.00K
100.0K
1.000M
Rev 3 February 2002
Low Limit
High Limit
187.7
192.3
392
408
1.888
1.911
18.88
19.11
188.8
191.1
893
906
1.879
1.921
18.79
19.21
187.9
192.1
8.80
9.20
98.7
101.3
.992
1.008
9.92
10.08
99.2
100.8
.988
1.012
Page 3

Advertisement

loading