Figure 17 Led Lead Bending; Figure 18 Led Install - ozQRP MDT Construction Manual

Dsb transceiver
Table of Contents

Advertisement

Step 14: LED
The LED leads need to be bent so that it can pass through the hole in the front panel. Figure 17
shows how this done. Once bent insert the LED leads into the PCB just far enough to allow them
to be soldered. Ensure the anode(A) and cathode(K) leads go in the correct holes as shown in
Figure 18.

Figure 17 LED lead bending

Figure 18 LED install

MDT Construction Manual – Issue 2
Page 27

Advertisement

Table of Contents
loading

Related Products for ozQRP MDT

Table of Contents