Through The Fireplace; Wall Pass-Throughs; Through The Fireplace Installation; An Approved Wall Pass-Through For The United States - Vermont Castings Defiant 1945 Homeowner's Installation And Operating Manual

Vermont castings woodburning stove home owner's installation and operating manual 1945
Hide thumbs Also See for Defiant 1945:
Table of Contents

Advertisement

Through the Fireplace

If your fireplace opening height is at least 29" (737 mm),
you may install a Defiant through the opening using a
"positive connection" kit, available from your local deal-
er. Positive connection kits ensure a tight fit between
the stove flue collar and the chimney flue. (Fig. 9)
Fireplace installations, whether connected to the flue
above or through the fireplace opening, have special
clearance requirements to adjacent trim and the mantel.
You'll find the required safe clearances for Defiant fire-
place installations on Page 12.
Floor protection requirements also apply to fireplace
installations. This information is on Page 10.
Flexible
Connector
Mantel Shield
Fireplace Adapter
Kit "Positive
Connection"
Fig. 9 Through the fireplace installation.

Wall Pass-Throughs

Whenever possible, design your installation so the con-
ST245
nector does not pass through a combustible wall. If you
fireplace
are considering a wall pass-through in your installation,
flex connector
check with your building inspector before you begin.
12/99
Also, check with the chimney connector manufacturer
for any specific requirements.
Accessories are available for use as wall pass-
throughs. If using one of these, make sure it has been
tested and listed for use as a wall pass-through.
In the United States, the National Fire Protection As-
sociation (NFPA) has established guidelines for passing
chimney connectors through combustible walls. Many
building code inspectors follow these guidelines when
approving installations.
30001693
Figure 10 shows one NFPA-recommended method. All
combustible material in the wall is cut away from the
single-wall connector to provide the required 12" (305
mm) clearance. Any material used to close up the open-
ing must be noncombustible.
Chimney
Connector
Floor Protec-
tion
Fig. 10 An approved wall pass-through for the United States.
Three other methods are also approved by the NFPA:
Placing a section of chimney connector inside a
ventilated thimble, which in turn is separated from
combustibles by 6" (152mm) of fiberglass insulating
material.
Placing a section of chimney connector inside a
section of 9" (230mm) diameter, solid-insulated,
factory-built chimney, with 2" (50mm) of air space
between the chimney section and combustibles.
ST245
Using a section of solid-insulated double-wall high
temperature chimney, with an inside diameter the
same as the chimney connector, at least one inch
of solid insulation, and a minimum of 9" (229 mm)
air space between the outer wall of the chimney
section and combustibles.
In Canada, The Canadian Standards Association has
established different guidelines for wall pass-throughs.
Figure 11 shows one method, in which all combustible
material in the wall is cut away to provide the required
18" (457mm) clearance for the connector. The resulting
space must remain empty. A flush-mounted sheet metal
cover may be used on one side only. If covers must be
used on both sides, each cover must be mounted on
noncombustible spacers at least 1" (25mm) clear of the
wall.
Defiant Woodburning Stove
Wall Stud
D E
F IA N
12" of
Noncombustible
Material
ST493
Brick pass thru
11/00
ST493
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents