Cisco Catalyst 3650 Series Hardware Installation Manual page 87

Hide thumbs Also See for Catalyst 3650 Series:
Table of Contents

Advertisement

Chapter 4
Power Supply Installation
Figure 4-11
Step 5
Use the ground screw to attach the single-hole ground lug to the switch's rear panel. Use two ground
screws to attach the dual-hole lug to the switch's rear panel
Using a ratcheting torque screwdriver, torque the ground-lug screws to 60 lbf-in. (960 ozf-in.).
Step 6
Step 7
Connect the other end of the grounding wire to an appropriate grounding point at your site or to the rack.
Figure 4-12
1
Single-hole ground screw and lug ring
OL-29734-01
Crimping the Ground Lug
Attaching the Ground Lug and Wire Assembly
1
2
Installing a DC Power Supply
(Figure
4-12).
2
Dual-hole ground adapter and dual-hole lug
Catalyst 3650 Switch Hardware Installation Guide
4-11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents