Locate these parts:
Hardware:
2. For each leg, line up the holes and
insert the bolts. Nuts are pre-welded
to the cabinet.
DO NOT
yet insert the two front
bolts indicated by the red arrows.
They will be used in the next
assembly step.
3. Securely tighten the bolts.
IMPORTANT:
The leg that contains
an
extra hole on its side must be
mounted at the front in the position
shown. This hole will be used later
to secure the gas hose to the leg
with a zip-tie.
Assembly Step 2
4 Legs
1/4-20 x 5/8" Bolts
16 Required
1. Turn the
cabinet
upside
down.
Cabinet
Assembly
HARDWARE BAG
Leg with
hole
5
Tools needed:
A
Phillips Head
Screwdriver