Download Print this page

Sealey GSS1515.V2 Instructions Manual page 12

Galvanized steel shed 1510 x 1510 x 1900mm

Advertisement

GardenShed
Step 5:
Assemble the front wall panel
Place part 4B (sheet) on the worktable. Fit part 20D (top channel), part 20E (bottom channel) and part 41B (jamb) (There are pre-drilled
holes for the next step on both parts 4B and 41B that must be aligned) and part 33R (mid wall channel) to the sheeting and fix them
with the self-tapping screws. NOTE: All screws marked with a cross should not be fixed at this stage. Make sure that the small lips on
channels 20D and 20E are always facing out. This ensures rainwater cannot build up inside your shed.
C
Fit part 41A (jamb), part 42 (jamb) and part 23 (bottom channel) and fix them with the self tapping screws (except those
marked with a cross). Make sure both joins (diagrams A and B) are fixed the same followed by diagrams C and D.
© Jack Sealey Limited
1.5 x 1.5 x 2.1m
ROOF TOP EDGE
20D
41B
A
42
41A
23
D
Original Language Version
RIDGES FACING UP
33R
4B
20E
B
Note: Channel 33R
should face down.
Note: Small lip on
channels 20D &
20E should always
be facing out.
GSS1515.V2, GSS1515G.V2 Issue: 2(I) - 13/04/17

Advertisement

loading

This manual is also suitable for:

Gss1515g.v2