Figure 36
1. Deck shim (or feeler
gauge)
2. Pivot link
3. Chain (limit)
4. U-bolt
4.
Thread the outboard serrated-flange nuts
(Figure
36) and torque them to 103 to 127 N∙m
(76 to 94 ft-lb).
5.
Start the engine, lower adjusted deck, raise the
other deck, shut off the engine, remove the key,
and wait for all moving parts to stop.
6.
Remove the shims or feeler gauges
Figure 37
g321235
5. Serrated-flange nut
(inboard)
6. Front of the machine
7. Serrated-flange nut
(outboard)
(Figure
37).
g321240
7.
Repeat steps in
Deck (page 22)
(page 24)
for the other mower deck.
25
Assembling the Shim to the
and
Tensioning the Chains