7.2 Parameters Settings

Go to the Device Commissioning screen and set SUN2000 parameters. For details
about entering the Device Commissioning screen, see
To set more parameters, tap Settings. For details about the parameters, see the
FusionSolar APP and SUN2000 App User Manual . You can also scan the QR code
to obtain the document.

7.2.1 Energy Control

On the home screen, tap Power adjustment to perform the corresponding
operation.
Figure 7-9 Energy control

7.2.1.1 Grid-tied Point Control

Function
Limits or reduces the output power of the PV power system to ensure that the
output power is within the power deviation limit.
Issue 03 (2020-07-20)
Figure 7-8 Physical layout design of PV modules
Copyright © Huawei Technologies Co., Ltd.
7 Man-Machine Interaction
B Device
Commissioning.
67

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun2000-6ktl-l1

Table of Contents