Huawei SUN2000-2KTL-L1 User Manual page 6

Hide thumbs Also See for SUN2000-2KTL-L1:
Table of Contents

Advertisement

SUN2000-(2KTL-6KTL)-L1
User Manual
Contents
5.8 (Optional) Connecting Signal Cables.............................................................................................................................50
6 System Commissioning........................................................................................................ 58
6.1 Verification Before Power-On........................................................................................................................................... 58
6.2 System Power-On................................................................................................................................................................. 59
7 Man-Machine Interaction....................................................................................................62
7.1 App Commissioning............................................................................................................................................................. 62
7.1.1 Downloading the FusionSolar App.............................................................................................................................. 62
7.1.2 (Optional) Registering an Installer Account............................................................................................................ 63
7.1.3 Creating a PV Plant and a User.................................................................................................................................... 64
7.1.4 (Optional) Setting the Physical Layout of the Smart PV Optimizers.............................................................. 64
7.2 Parameters Settings............................................................................................................................................................. 67
7.2.1 Energy Control.................................................................................................................................................................... 67
7.2.1.1 Grid-tied Point Control................................................................................................................................................. 67
7.2.1.2 Battery Control................................................................................................................................................................ 70
7.2.2 AFCI........................................................................................................................................................................................ 75
7.2.3 IPS Check (for Italy CEI0-21 Grid Code Only)......................................................................................................... 77
7.2.4 DRM (Australia AS4777)................................................................................................................................................. 78
8 System Maintenance............................................................................................................ 81
8.1 System Power-Off................................................................................................................................................................. 81
8.2 Routine Maintenance.......................................................................................................................................................... 82
8.3 Troubleshooting..................................................................................................................................................................... 82
9 SUN2000 Disposal................................................................................................................. 93
9.1 Removing a SUN2000......................................................................................................................................................... 93
9.2 Packing a SUN2000.............................................................................................................................................................. 93
9.3 Disposing a SUN2000.......................................................................................................................................................... 93
10 Technical Parameters......................................................................................................... 94
10.1 SUN2000 Technical Specifications................................................................................................................................ 94
10.2 Optimizer Technical Specifications............................................................................................................................... 98
A Grid Code.............................................................................................................................. 101
B Device Commissioning....................................................................................................... 104
C Resetting Password............................................................................................................ 107
D Rapid Shutdown................................................................................................................. 110
E Locating Insulation Resistance Faults............................................................................ 111
F Acronyms and Abbreviations............................................................................................114
Issue 03 (2020-07-20)
Copyright © Huawei Technologies Co., Ltd.
v

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sun2000-6ktl-l1

Table of Contents