Vanguard SBVBN(C) Operating And Installation Manual page 17

Cast iron stove and b-vent (freestanding fireplace heater) burner system
Table of Contents

Advertisement

CAST IRON STOVE
AND B-VENT
BURNER SYSTEM
INSTALLATION
Continued
Installing 9-Volt Battery in Hand-
Held Remote Control Unit
1. Remove battery cover on back of re-
mote control unit
2. Attach terminal wires to a 9-volt bat-
tery (not included). Place battery into
the battery housing.
3. Replace battery cover onto remote con-
trol unit.
Battery
Cover
Terminal
Wires
9-Volt
Battery
Battery Housing
Figure 39 - Installing Battery in Hand-
Held Remote Control Unit (GHRC Only)
Terminal
Wires
9-Volt
Battery
Battery Housing
Figure 40 - Installing Battery in Hand-
Held Remote Control Unit (GHRCTA Only)
106828
REMOVING/REPLACING
GLASS DOOR
You must remove glass door to install logs,
lava rock, and ember material. To remove
glass door, you must first remove the front
panel on stove body.
CAUTION: Do not operate this
burner system with a broken
glass door panel or without the
glass door panel securely in
place. For replacement part in-
formation see Replacement
Parts , page 26.
1.
Remove 2 bolts from bottom of stove
(if still installed) and one from the top
of stove to remove front panel (see Fig-
ure 41).
Remote
2.
Remove the screws from the 2 tabs at
Control Unit
the top of the glass door while holding
door securely keeping it from falling
forward (see Figure 42).
3.
Grasp door by both sides and ease it
upward off of the lower bracket (see
Figure 42).
4.
To replace glass door, follow the above
instructions in reverse.
Remote
Control Unit
Battery
Cover
OWNER'S MANUAL
Figure 41 - Removing Front Panel from
Stove
Figure 42 - Removing Glass Door from
Burner System
For more information, visit www.desatech.com
17
Bolt
Stove Front Panel
Screw
Glass
Door
Bolt
Continued

Advertisement

Table of Contents
loading

This manual is also suitable for:

SbvbpcSbvbnSbvbp

Table of Contents