Installation Instructions; Safety Precautions; Shipment And Transit; Machine Installation - Stoelting F231 Owner's Manual

Hide thumbs Also See for F231:
Table of Contents

Advertisement

Total Restaurant Supply - https://totalsupply1.com - Toll Free 1-800-944-9304 - Local 507-288-9454

2.1 SAFETY PRECAUTIONS

Do not attempt to operate the machine until the safety
precautions and operating instructions in this manual are
read completely and are thoroughly understood.
Take notice of all warning labels on the machine. The la-
bels have been put there to help maintain a safe working
environment. The labels have been designed to withstand
washing and cleaning. All labels must remain legible for
the life of the machine. Labels should be checked periodi-
cally to be sure they can be recognized as warning labels.
If danger, warning or caution labels are needed, indicate
the part number, type of label, location of label, and quantity
required along with your address and mail to:
ATTENTION: Customer Service
Kiel, Wisconsin 53042

2.2 SHIPMENT AND TRANSIT

The machine has been assembled, operated and inspected
at the factory. Upon arrival at the fi nal destination, the
entire machine must be checked for any damage which
may have occurred during transit.
With the method of packaging used, the machine should
arrive in excellent condition. THE CARRIER IS RESPON-
SIBLE FOR ALL DAMAGE IN TRANSIT, WHETHER
VISIBLE OR CONCEALED. Do not pay the freight bill
until the machine has been checked for damage. Have
the carrier note any visible damage on the freight bill. If
concealed damage and/or shortage is found later, advise
the carrier within 10 days and request inspection. The
customer must place claim for damages and/or shortages
in shipment with the carrier. Stoelting, Inc. cannot make
any claims against the carrier.

2.3 MACHINE INSTALLATION

Installation must be completed by a qualifi ed
electrician/refrigeration specialist.
Incorrect installation may cause personal injury,
severe damage to the machine and will void fac-
tory warranty.
Installation of the machine involves moving the machine
close to its permanent location, removing all crating, set-
ting in place, assembling parts, and cleaning.
A.
Uncrate the machine.
B.
Install the four casters. Turn the threaded end
into the machine until no threads are showing. To
level, turn out casters no more than 1/4" maximum,
then tighten all jam nuts.
2940 Hwy 14 W, Rochester, MN 55901

INSTALLATION INSTRUCTIONS

STOELTING
502 Hwy. 67
WARNING
SECTION 2
C.
The machine must be placed in a solid level
position.
Accurate leveling is necessary for correct drainage
of freezing cylinder and to insure correct overrun.
D.
Machines with air cooled condensers require a
minimum of 3" (7,5cm) of space on both sides
for proper circulation.
E.
On air cooled machines, install the air baffl e to
the bottom of the right side panel. Remove the
panel screws and put the baffl e in place. Align
the bottom of the baffl e with the fl oor and tighten
the panel screws (Fig. 2-1).
E.
Machines that have a water cooled condenser
require 1/2" NPT supply and drain fi ttings.
Figure 2-1 Installing Baffl e

2.4 INSTALLING PERMANENT WIRING

To install wiring follow the steps below:
A.
Refer to the nameplate on the side panel of the
machine for specifi c electrical requirements. Make
sure the power source in the building matches
the nameplate requirements.
B.
Remove the back panel and the junction box
cover located at the bottom of the machine.
C.
Install permanent wiring according to local code.
3
NOTE

Advertisement

Table of Contents
loading

Table of Contents