Installation - Swann Smith's Caspian EC Series Installation And User Manual

Fan convectors
Hide thumbs Also See for Smith's Caspian EC Series:
Table of Contents

Advertisement

Installation

1. Unlock the front access panel
Unlock and lower the front access panel using the
keys supplied.
2. Fix unit to wall or ceiling
Fix the unit to the ceiling or wall via suitable
fixings. If fitted to suspended ceilings or similar
then suitable means of support such as threaded
rods or chains must be used.
3. Connect the pipes
Connect the heating system flow and return pipes
to the heater pipe work. Pipe entry/exit can be
made through either the back of the unit or by
using the pipe knockouts on the bottom of the
unit. Do not use soldered fittings to the heater
pipe work as the heat generated may cause
damage to internal wiring and components.
Compression fittings should be used.
Pipe knockouts
at rear of unit
pipe knockouts at rear of unit
remove screw
remove screw
remove screw
remove screw
Note: We recommend the use of full-flow service
valves. The valves should be accessible after
completion of the installation. We also advise the
fitting of an air vent at the highest point on either
the flow or return pipe to remove any air trapped
within the system.
4. Open the service valves
Open the full flow service valves and check for
water leaks. Remove any trapped air from the
unit via the built in bleed screws as shown in the
diagram below.
5. Electrical supply
Isolate the electrical supply
6. Connect the power supply
Connect the power supply from the fused spur (3
Amp) to the heater terminal block marked Supply
E N L via the cable entry hole in the top chassis of
the heater.
Issue 001 - July 2020 | SmithsEP.co.uk | 11
N
L
Supply
Supply

Advertisement

Table of Contents
loading

Table of Contents