6
Installation
6.3
Electrical Connections
6.4
Filling the Installation
26
See
In case of difficulty contact service support; contact
details are available on page 2 of this booklet.
Warning
•
Disconnect from the mains electrical supply before
removing any covers.
•
Do Not bypass the thermal cut-out(s) in any
circumstances. All electrical wiring should be
carried out by a competent electrician and be in
accordance with the latest I.E.E Wiring Regulations.
•
Each circuit must be protected by a suitable fuse
and double pole isolating switch with a contact
separation of at least 3mm in both poles.
•
Check expansion vessel pre-charge pressure. The
expansion vessel pressure must be set in accordance with
the inlet pressure set on the pressure reducing valve.
•
Ensure the drain cock is CLOSED.
•
Open a hot tap furthest from the cylinder.
•
Open the mains stop cock to fill the unit. When water flows
from the tap, allow to run for a few minutes to thoroughly
flush through any residue, dirt or swarf, then close the tap.
•
Open successive hot taps to purge the system of air.
Issue 1 06/02/20