Configuring the Switch

Step 4
Redirect the CMC console to the switch internal serial console interface. Enter this command at the CMC
command prompt:
connect switch-N
where N is the chassis I/O module bay number in which the switch is inserted.
To return to the command prompt, press this key sequence:
Enter Ctrl \ (Press Enter, and press the Control key and the backslash key together.)
Step 5
Go to the

Waiting for POST to Complete

Follow these steps to verify that POST completes successfully:
Wait for the switch to complete the POST. During POST, the LEDs blink while tests verify that the
Step 1
switch functions properly. Wait for the switch to complete POST, which can take several minutes.
Verify that POST has completed by confirming that the SYST LED remains green. If the switch fails
Step 2
POST, the SYST LED turns amber. See
POST errors are usually fatal. Call Cisco Customer Support immediately if your switch fails POST.
Wait for the switch to complete flash initialization. When you see the prompt
Step 3
Started!
If you do not see the prompt
on the terminal to 9600 baud.
Make sure that the System Status/ID LED on the switch is off. This means that the switch is operating
Step 4
properly.
See the
Step 5
initially configuring the switch.
If the switch obtains an IP address through the Fa0 port, you can use the device manager to configure
Step 6
the switch. See the

Completing the Initial Configuration

Follow these steps to complete the setup program and to create an initial configuration for the switch.
For information about automatically configuring the switch, see the "Assigning the Switch IP Address
and Default Gateway" chapter in the switch configuration guide on Cisco.com.
After you have pressed Enter or Return after the prompt to start the initial configuration setup program,
Step 1
enter yes at these prompts:
Would you like to terminate autoinstall? [yes]: yes
--- System Configuration Dialog ---
Continue with configuration dialog? [yes/no]: yes
Cisco Catalyst Blade Switch 3130 for Dell and Cisco Catalyst Blade Switch 3032 for Dell Hardware Installation Guide
2-10
"Waiting for POST to Complete" section on page 2-10
, press Return or Enter.
Press Return to Get Started!
"Completing the Initial Configuration" section on page 2-10
"Using the Device Manager to Configure the Switch" section on page
to finish configuring the switch.
Figure 1-1 on page 1-2
for the location of the SYST LED.
, be sure that you have set the baud rate
Chapter 2
Switch Installation
Press Return to Get
for instructions on setting up and
2-13.
OL-13269-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst blade switch 3032Cbs3032gCbs3130g-sCbs3130x-s

Table of Contents