Daystrom Heathkit IP-22 Assembly Manual page 18

Isolation
Table of Contents

Advertisement

& % J = ? Y - = * ~ w J
Page 15
Detail 5A
NOTE: When connecting the line cord leads
( ) Install the two knobs on the shafts of
in the following steps, cut each lead to the
rotary switches
F
and G. The setscrew
length required to reach the lug called out in
in each knob should be tightened against
the step; then strip 1/4" of insulation from the
the flat side of the switch shaft.
lead and tin ("tin" means melt a small amount
of solder over the exposed wire end).
( ) Screw the two binding post caps on the
Connect the line cord leads to terminal strip L
binding posts at C and D.
a s follows:
Lead Color
( ) White
( ) Black
to lug
Carefully check all connections made thus f a r
against Pictorials 2, 4, and 5. When satisfied
1 (S-3)
that all wiring is correct, s e t the front panel-
transformer chassis assembly aside while as-
2 (S-2)
sembling the subchassis.
( ) Green
3 (S-2)

Advertisement

Table of Contents
loading

Table of Contents