5
Damaged
Correct
Inclined
Surface
Step 7 Connecting the assembly
pipes to the refrigerant pipes
There are two refrigerant pipes of different diameters :
1
1
Spanner
3
Union
Uneven
Cracked
Thickness
2
Torque
wrench
3
Flare nut
Outer Diameter (mm)
NOTE
and flaring the pipes
2
3
4
5
CAUTION
Step 6 Cutting
10
11
English