Download Print this page

Dynojet Power Commander V Installation Instructions Manual page 6

For ducati m696

Advertisement

FIG.J
FIG.K
FIG.L
14-001
www.powercommander.com
PCV ground
12 Attach the ground wire of the PCV to the stock ground location (Fig. J).
13 Reinstall the plastic cover.
14 Lift the rear of the fuel tank up.
15 Unplug both of the stock O2 sensors from the stock wiring harness (Fig. K).
Figure K is shown with the fuel tank removed but these steps can be down
without removing the tank.
16 Plug the O2 Optimizer connectors labeled "Front" in-line of the front cylinder
O2 sensor and stock wiring harness (marked with a O).
17 Plug the O2 Optimizer connectors labeled "Rear" in-line of the rear cylinder
O2 sensor and stock wiring harness (marked with an V).
The O2 Optimizer connectors are labeled "FRONT" and "REAR" on
the white sticker. Do NOT mix these up.
18 Tuck the connectors in the recessed openings of the RH frame.
19 Lower the fuel tank back into position making sure it does not interfere with any
of the wiring harnesses.
09-11 Ducati M696 PCV - 6

Advertisement

loading
Need help?

Need help?

Do you have a question about the Power Commander V and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel