Daikin VRV 5-S Series Installer And User Reference Manual page 37

Hide thumbs Also See for VRV 5-S Series:
Table of Contents

Advertisement

RXYSA4~6A7V/Y1B
VRV 5-S system air conditioner
4P600330-1 – 2020.01
Note: In case a cool/heat changeover remote control switch is used, the position of
DIP switch 1 (DS1-1) on the main PCB needs to be switched to the ON position.
To start
1 Select operation mode with the cool/heat changeover switch as follows:
Cooling operation
1
1
2 Press the ON/OFF button on the user interface.
Result: The operation lamp lights up and the system starts operating.
To stop
3 Press the ON/OFF button on the user interface once again.
Result: The operation lamp goes out and the system stops operating.
NOTICE
Do not turn off power immediately after the unit stops, but wait for at least 5
minutes.
To adjust
For programming temperature, fan speed and air flow direction refer to the
operation manual of the user interface.
Heating operation
1
1
8
Operation
|
Fan only operation
1
Installer and user reference guide
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents