Download Print this page
IRSAP THE RADIATOR COMPANY Ceres Fitting Instructions

IRSAP THE RADIATOR COMPANY Ceres Fitting Instructions

Advertisement

Quick Links

Technical Specifications
Materials
Stainless Steel.
Connections
1
Test pressure
5.2 Bar
Testing authority
EN442
Maximum operating pressure
4 Bar
Maximum working temperature
90ºC
Packaging
Covered with Polystyrene in a Cardboard box.
Cleaning
Use provided cleaning glove or a soft cloth with a
propietary stainless steel cleaning product
PLEASE NOTE: Systems using micro bore pipework must have adequate pressure and
flow rates for the number and style of radiators on the system.
Terms & Conditions
All products must be inspected once removed from the packaging and The Radiator Company
notified within 28 days of delivery of any scratches, blemishes or other damage.
The Radiator Company will then replace the radiator.
Imperfect radiators should therefore not be fitted and The Radiator Company will not accept
responsibility for replacement of scratched or damaged radiators once they have been fitted.
This includes any consequential loss or cost of fitting.
If The Radiator Company are not notified within 28 days of the date on the signed delivery note
then it will be deemed that The Radiator Company have fully complied with its obligations and
claims will not be considered.
Failure to comply with any of the above may invalidate any claims.
We recommend that after you check the product on delivery that it is stored in its packaging
to prevent damage prior to installation. The Radiator Company cannot accept responsibility for
items damaged after delivery.
Guarantees & Liabilities
As we are not the manufacturers of this product we will take all reasonable endeavours to make
over to you the benefit of any warranty or guarantee given by the manufacturer, which is usually
five years on most of our range. (Copies of specific guarantees for any of our products are
available on request).
The guarantees in all cases are subject to the products being installed in accordance with British
and or European standards as well as these fitting instructions. The guarantees in all cases are
restricted to the free of charge replacement or repair of the failed product only. Our liability will
under no circumstances extend beyond the repair or replacement of the product supplied by us.
Claims for either labour in replacement or damage to property are not admissible. Any goods
that are returned, in the event of a problem, will belong to The Radiator Company.
If you have any questions please contact us: 01342 302250, www.theradiatorcompany.co.uk
"
flow and return.
2
THE
RADIATOR
COMPANY
Fittings Instructions
PLEASE NOTE : This radiator can
be heavy and requires a minimum
of two people to fit, on a suitable
wall structure.
CERE2.2
A brand of
Ceres
This slim profile radiator appears to float off the
wall.
Please read these instructions and terms and
conditions carefully prior to installation.
Failure to do so may invalidate the warranty.
The Radiator Company
Units 13 - 14 Charlwoods Road
East Grinstead
West Sussex
RH19 2HU
, Italy's leading manufacturer of design led radiators
10

Advertisement

loading
Need help?

Need help?

Do you have a question about the THE RADIATOR COMPANY Ceres and is the answer not in the manual?

Questions and answers

Summary of Contents for IRSAP THE RADIATOR COMPANY Ceres

  • Page 1 Technical Specifications RADIATOR Ceres Materials Stainless Steel. COMPANY Connections ” flow and return. Test pressure 5.2 Bar Fittings Instructions Testing authority EN442 Maximum operating pressure 4 Bar Maximum working temperature 90ºC Packaging Covered with Polystyrene in a Cardboard box. PLEASE NOTE : This radiator can Cleaning be heavy and requires a minimum Use provided cleaning glove or a soft cloth with a...
  • Page 2 Diagrams of Ceres Pipe Centres continued... Pipe centres left to right width + valves 80 to 105 It is essential to accurately mark these positions as there is Pipe centres from wall 55mm to 80mm little tolerance for movement on the brackets.