Installation; Unit Installation - Midea LSBLG MCF Series Technical & Service Manual

Water cooled screw chiller
Table of Contents

Advertisement

Flooded type water cooled screw chiller (MIC)
V. Installation
Safety considerations
Only authorized personnel should maintain the unit. The access limitation device must be installed by
the customer.
After the unit has been received, when it is ready to be installed or reinstalled, and before it starts up, it
must be inspected for damage. Check that the refrigerant circuit(s) is (are) intact, especially that no
components or pipes have shifted. If in doubt, carry out a leak tightness check and verify with the
manufacturer that the circuit integrity has not been impaired. If damage is detected upon receipt,
immediately submit a claim with the shipping company.
Arrange for a specialist company to unload the machine.
Safety is only guaranteed, if these instructions are followed carefully. If this is not the case, there is a risk
of damage or injury..
1.

Unit installation

1).Lifting
1 When transporting the unit, avoid collision between the unit and other objects.
2 Move the unit by placing a roller at the bottom of the unit to avoid damage.
3 Choose a suitable crane according to the unit's weight ( Purchase insurance if possible) ; Lift the unit
according to the following chart strictly. The steel rope winds the lifting hook in one circle to prevent steel
rope slipping when the weight is unbalanced. Set up a security perimeter during hoisting and follow local
regulations. Prohibit non-staff from entering the job site or from staying under the unit or the hoisting
crane.
Any person is not allowed to stand below the unit when sling it.