Part 4 Installation - Midea Aqua Tempto Power Series Manual

Tropical air-cooled scroll chiller 50hz
Table of Contents

Advertisement

Aqua tempo power series tropical air-cooled scroll chiller 50Hz

Part 4 Installation

1. Transportation and foundation installation............................................................................. 157
1.1 Transportation ............................................................................................................................................................ 157
1.2 Installation space ....................................................................................................................................................... 160
1.3 Installation foundation .............................................................................................................................................. 163
1.4 Installation of damping devices ................................................................................................................................. 164
2. Water system installation ...................................................................................................... 165
2.1 Basic requirements of connection of chilled water pipes .......................................................................................... 165
2.2 Water quality ............................................................................................................................................................. 166
2.3 Installation & regulation guide for water flow switch ................................................................................................ 167
3. Installation of water system pipeline ...................................................................................... 168
3.1 MGBT-F25W/RN1, MGBT-D25W/RN1, MGBT-D30W/RN1, MGBT-F30W/RN1 ........................................................... 169
3.2 MGBT-F(D)60W/RN1 .................................................................................................................................................. 170
3.3 MGBT-F120W/RN1 ..................................................................................................................................................... 172
3.4 MGBT-F180W/RN1 ..................................................................................................................................................... 173
3.5 MGBT-F250W/RN1 ..................................................................................................................................................... 174
3.6 Chilled water flow ...................................................................................................................................................... 175
3.7 Design of the store tank in the system ....................................................................................................................... 176
4. Wiring installation ................................................................................................................. 178
4.1 Precautions: ............................................................................................................................................................... 178
4.2 Power supply specification ........................................................................................................................................ 178
4.3 Requirements of wiring connection ........................................................................................................................... 178
4.4 Wiring steps ............................................................................................................................................................... 180
4.5 Fielding wiring ............................................................................................................................................................ 181
5. Trial run ................................................................................................................................. 182
5.1 Points for attention prior to trial run ......................................................................................................................... 182
5.2 Check items table after installation. .......................................................................................................................... 183
5.3 Trial run ...................................................................................................................................................................... 184
156
MCAC-ATSM-2014-09

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents