Download Print this page

Mitsubishi Electric LGH-F300RX5-E1 Installation Instructions Manual page 6

Lossnay energy recovery ventilator
Hide thumbs Also See for LGH-F300RX5-E1:

Advertisement

Installation method (continued)
Model LGH-F1200RX
-E1
5
CAUTION
1. Make sure to attach each sheet of insulation without a
gap.
If a gap is found, or the metal surface is exposed,
attach additional insulation to cover.
2. Overlap the insulation for the upper and lower
surfaces with the insulation for the side surfaces
without a gap as shown
A-5
A-1
A-6
A-7
Insulation
U
V
31 1/2
25 1/2
(800)
(648)
11 1/4
2
(285)
(50)
27 9/16
10/16
(700)
(15)
11 1/4
2
(285)
(50)
27 9/16
10/16
(700)
(15)
48 7/16
23 5/8
C-1
(1230)
(600)
48 7/16
21 11/16
(1230)
(550)
48 7/16
23 5/8
D-1
(1230)
(600)
Insulation
W
X
13 13/16
E-1
-
(351)
13 13/16
E-2
-
(351)
28 3/8
F-1
-
(720)
28 3/8
F-2
-
(720)
* View from the backside of insulation
6
A-2
A-3
Insulation
Duct
connecting
A-4
Unit: Inch (mm)
F1200RX
5
Thickness
pcs./unit
1/2
1
(13)
1/2
2
(13)
1/2
1
(13)
1/4
2
(6)
1/4
1
(6)
1/4
1
(6)
1/4
2
(6)
1/2
1
(13)
Unit: Inch (mm)
F1200RX
5
Y
Z
Thickness
pcs./unit
1 4/4
1/2
1
(31)
(13)
1 4/4
1/2
-
1
(31)
(13)
1
1/4
-
1
(25)
(6)
1
1/4
1
(25)
(6)
F-1
F-2
A-5
A-6
A-2
A-3
A-7
A-1
A-4
D-1
Cover the side
surface
Unit
U
E-1, F-2
3/16 (5)
3 1/4 (83)
Y
W
Make sure to attach
each sheet of
C-2
insulation without
C-1
a gap.
B-1, B-2 1 pcs./unit
5 15/16 (150)
29 15/16 (760)
E-2, F-1
3 3/4 (83)
3/16 (5)
X
B-1
B-2
D-2
E-1
E-2
Z

Advertisement

loading

This manual is also suitable for:

Lgh-f470rx5-e1Lgh-f600rx5-e1Lgh-f1200rx5-e1