INSTALLATION PREREQUISITES

The following items should be completed prior to installing the Total Access 1248:
• Make sure that the network feed is in place.
• Make sure that local power is available and that the required fuses are installed.
The maximum power draw for the Total Access 1248 system is 75
watts.
ADTRAN recommends an external fuse rated at 3.0 amps.

INSTALLATION STEPS

The following steps are required to install the Total Access 1248. Each step has an associated
procedure which is referenced below the step. Each procedure provides detailed information
for completing the step.
1. Mount the Total Access 1248 system with the appropriate hardware.
For detailed information, refer to
2. Ground the Total Access 1248.
For detailed information, refer to
3. Make the power connections to the Total Access 1248.
For detailed information, refer to
4. Connect the ADSL2+ plus POTS and POTS cables.
For detailed information, refer to
5. Turn-up the Total Access 1248.
For detailed information, refer to the Host unit Installation and Maintenance Practice.
61179641L5-5C
CAUTION
"Mounting the Total Access 1248"
"Ground Connection"
"Power Connection"
"ADSL2+ Plus POTS Connections"
Installation Prerequisites
on page 3-4.
on page 3-7.
on page 3-8.
on page 3-10.
3-3

Advertisement

Table of Contents
loading

Table of Contents