en – Original Instructions
3
4
5
6
7
18
Press the lever of the connector
Insert the cores of the conductors in the respective holes of the connector and release the lever
Engage the connector in the body of the cable gland
Insert the ring in the seat of the body of the cable gland and tighten the nut on the body of the
cable gland
Tightening torque: 2 Nm (1.5 lbf·ft)
Insert the connector in the socket of the unit
ecocirc/ecocirc+, Additional Installation, Operation and Maintenance Instructions