Scan for full manual
Step 1: Check what's in the box
VS-211X
/
VS-411X 4K Auto Switcher
1 Power adapter and cord
Step 2: Get to know your VS-211X / VS-411X
The terms HDMI, HDMI High-Definition Multimedia Interface, and the HDMI Logo are trademarks or registered trademarks of HDMI Licensing Administrator, Inc.
#
Feature
1
PROG Micro USB Connector
2
SETUP 4-way DIP-Switches
3
IN Buttons
4
OUT LED
5
ON LED
6
HDMI™ IN Connectors
HDMI™ OUT Connector
7
8
AUDIO OUT3.5mm Mini Jack
Connector
9
REMOTE IN Terminal block Connector
10
5V DC Power Connector
Step 3: Install VS-211X / VS-411X
Install
VS-211X
/
VS-411X
using one of the following methods:
•
Attach the rubber feet and place the unit on a flat surface.
•
Fasten a bracket (included) on each side of the unit and attach it to a flat surface
(see www.kramerav.com/downloads/VS-411X).
•
Mount the unit in a rack using the recommended rack adapter
(see www.kramerav.com/product/VS-411X).
VS-211X / VS-411X Quick Start
VS-211X and VS-411X Quick Start Guide
This guide helps you install and use your
Go to
www.kramerav.com/downloads/VS-411X
upgrades are available.
Function
Connect to upgrade the firmware.
Set the operation DIP-switches (see
Press to select an HDMI input (button lights orange).
Lights green when an HDMI output is connected.
Lights green when the device receives power.
Connect to an HDMI source (2 for VS-211X, 4 for VS-411X).
Connect to an HDMI acceptor.
Connect to an unbalanced stereo audio acceptor.
Connect to contact closure switches by momentary contact between the desired
pin and common GND pin to select an input.
Connect to the power supply and to the mains electricity.
VS-211X
/
VS-411X
for the first time.
to download the latest user manual and check if firmware
4 Rubber feet
1 Quick start guide
Setting the
• Ensure that the environment (e.g., maximum ambient temperature &
air flow) is compatible for the device.
• Avoid uneven mechanical loading.
• Appropriate consideration of equipment nameplate ratings should be
used for avoiding overloading of the circuits.
• Reliable earthing of rack-mounted equipment should be maintained.
• Maximum mounting height for the device is 2 meters.
P/N:
2 9 0 0 - 3 0 1 2 4 7 QS
DIP-Switches).
Rev: 3
Need help?
Do you have a question about the VS-211X and is the answer not in the manual?
Questions and answers