Power Unit Installation; Routing Hydraulic Hose; Lift Start Up / Final Adjustments - Titan HD4P-12000 Installation, Operation & Maintenance Manual

4-post lift
Table of Contents

Advertisement

11) After routing the Cables double-check to make sure all are properly positioned and
REMAIN WITHIN THE GROOVES of ALL pins. (See Fig. E)

POWER UNIT INSTALLATION

12) Mount the POWER UNIT to the Mounting Bracket using the M8 Hex Bolts and nuts
(torque to 35-45 PSI) then FILL THE RESERVOIR with 20-quarts of premium quality ISO-
32, AW-46 Hydraulic oil.

ROUTING HYDRAULIC HOSE

13) Install the hydraulic fittings to the power unit and base end of the cylinder under
runway, run the power unit hose through the front crossbeam tube to the cylinder base.
(refer to Fig. F) NOTE: BE SURE THAT THE HOSE IS CLEAR OF MOVING PARTS.
Hose

LIFT START UP / FINAL ADJUSTMENTS

14) Be sure to grease all (6) zerk fittings. (See Fig. G)
Fig. E
All cables MUST remain in sheave grooves. Before lift start-up,
check all of the cables for proper routing.
SLACK
SAFETY PIN
Fig. F
Fig. G
12
Fig. E
Hydraulic
Fitting

Advertisement

Table of Contents
loading

Table of Contents