Page 1
® INSTALLATION, OPERATION, & MAINTENANCE MANUAL MODEL: SDML-1000D / SDML-1000D-XLT 1,000 LB CAPACITY PNEUMATIC MOTORCYCLE/ATV LIFT *OPTIONAL EQUIPMENT SHOWN FOLLOW THIS MANUAL CAREFULLY TO ENSURE THE MACHINE WILL FUNCTION CORRECTLY AND PROVIDE MANY YEARS OF DEPENDABLE SERVICE. FAILURE TO FOLLOW THESE INSTRUCTIONS AND SAFETY WARNINGS MAY RESULT IN PERSONAL INJURY OR PROPERTY DAMAGE.
Page 2
Claims must be filed to cover cost. If you have any questions or if we can be of any further assistance, please don’t hesitate to contact a Titan Lifts® representative at 1-888-908-4826. Thank you for the opportunity to continue to serve your lift equipment needs.
CONTENTS INSTRUCTIONS ..........1 UNPACKING AND SET-UP *REFER TO PARTS LIST FIG. 1 ..........1 OPERATION & MAINTENANCE ......2 SAFETY PRECAUTIONS ........3 FRONT WHEEL CLAMP ........4 INSTALLATION DRAWING ........4 FRONT EXTENSION ..........4 INSTALLATION DRAWING ........4 SIDE EXTENSIONS ..........5 INSTALLATION DRAWING (XLT ONLY) ....5 PARTS LIST (FIG.
INSTRUCTIONS WARNING: READ ENTIRE MANUAL AND COMPLY WITH ALL SAFETY AND SERVICE PRECAUTIONS. DEATH, PERSONAL INJURY AND/OR PROPERTY DAMAGE MAY OCCUR IF INSTRUCTIONS ARE NOT FOLLOWED CAREFULLY. UNPACKING AND SET-UP *REFER TO PARTS LIST FIG. 1 1. Carefully unpack the lift making sure that all of the parts have been included. 2.
OPERATION & MAINTENANCE *REFER TO PARTS LIST FIG. 1 * TEST THE LIFT SEVERAL TIMES FOR PROPER OPERATION BEFORE ATTEMPTING TO LIFT A LOAD. 1. All moving parts have been lubricated at the factory and should be re-lubricated before the first use and at least once every six months to prevent damage. Grease fittings are located at each frame pivot shaft and at the top ends of the inside frame assembly.
17. Industrial applications must follow OSHA requirements. 18. Do NOT use for aircraft purposes. 19. Have your lift serviced by a qualified technician using only identical Titan Lifts ® replacement parts and attachments. This will ensure that the safety of the lift is maintained.
PARTS LIST (FIG. 1) - CONTINUED DESCRIPTION DESCRIPTION FOOT OPERATED AIR VALVE - Fig. 2 AIR HOSE R-PIN SCREW CAP M10 SAFETY BAR (COLOR) WASHER Φ10 MACHINE BOLT FRONT COVER CYLINDER PIVOT SHAFT NYLON O-RING RETAINING RING O-RING RIGHT EXTENSION RAMP - XLT ONLY O-RING SIDE EXTENSION - XLT ONLY SHAFT BUSHING...
Page 13
WARRANTY REGISTRATION In order to utilize the warranty on this Titan Lifts product, you must register your product with us. The TITANLIFTS.COM/WARRANTIES simplest way to do this is to visit and submit your information online. If you prefer to send your information through the mail, please fill out the form below and send this page to us at :...
Page 15
LIMITED WARRANTY The Titan 2 Post lifts and 4 Post lifts are backed by a standard 1 year replacement parts warranty and a 5 year structural warranty from the date of purchase, to the original purchaser only. The 1 year replacement parts warranty covers power units, hydraulic cylinders, and all other assembly components such as, but not limited to: turn plates, slip plates, cables, chains, valves, switches etc.