3-INSTALLATION OF THE EQUIPMENT

3.1- General considerations::

 Place the chlorination cell in the highest position possible of the purification
circuit and always after the filter.
 If possible, it is recommended to install the cell with a by-pass system with
its corresponding shut-off valves. This is to facilitate maintenance of the cell.
 A good earth connection is essential. Use a differential relay with max.
30mA of sensitivity.
 If a good quality earth connection is not available, place an
earth connection kit between the electrolysis cell and the redox
probe. OPTIONAL KIT
Manual PRO v.2
--
<1.5
100
160
--
<1700
--
<1000
150
250
35 / 53

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BSPOOL PRO200 and is the answer not in the manual?

This manual is also suitable for:

Bspool pro250Bspool pro500Bspool pro750Bspool pro1000

Table of Contents