Download Print this page

Installation Procedure - Lefroy Brooks M2-2201 Installation, Operating, & Maintenance Instructions

Fleetwood lever 5-hole bath set & pull-out black hand shower with deck diverter-trim only, to suit r1-4007 rough

Advertisement

Installation Procedure

Lefroy Brooks always recommends that plumbing products be installed by a licensed professional.
Shut off main water supply before installation.
1
Make sure that main water supply is shut off before further installation.
Take off all rubber protective caps, plugs from valves, as well as the underneath protective bubble
bags.
2
Install escutcheons and handles.
1
Steps 1-2
2
4

Advertisement

loading