Download Print this page

Instal Ation Procedure - Lefroy Brooks M1-2151 Installation, Operating, & Maintenance Instructions

Lever 4-hole bath set with diverter & pull-out black hand shower trim only

Advertisement

Installation Procedure
Lefroy Brooks always recommends that plumbing products be installed by a licensed professional.
Shut off main water supply before installation.
1
Make sure that main water supply is shut off before further installation. Take off all rubber
protective caps, plugs from valves, as well as the underneath protective bubble bags.
2
Install handles.
3
Important: It is recommended that to prevent the spout from accidentally rotating after
installation, where possible, the small brass pin should be screwed into the spout base.Drill a
1/4" (5.5mm) diameter hole into the deck to a depth of about 7/16" - 9/16" (11-15mm),
following the position indicated in the figure above.
1
2
Steps 1-3
1-3/16"(30mm)
3
4

Advertisement

loading

This manual is also suitable for:

Ml 1250