Download Print this page

Installation And Operation - Emerson SolaHD SPS Series User Manual

Advertisement

5.0 Installation and Operation

5.1 Inspection
Remove the UPS from its packaging and inspect it for damage that may have occurred during shipping. If
shipping damage has occurred, repack the unit, and contact your local carrier and SolaHD
distributor immediately.
5.2 Placement
Install the UPS indoors in a protected environment that provides adequate airflow around the unit, and is
free from excessive dust, moisture and contaminants. The UPS may be installed in an environment where the
ambient temperature is 0°–40°C.
5.3 Starting the UPS
To turn on/off the UPS, press the power switch for 3 seconds.
When the Green LED Indicator:
Shows a steady light, the UPS is in AC Mode.
Is flashing, the UPS is in Battery Mode.
5.4 Battery Charging
Plug AC input cord into utility power for at least eight (8) hours in order to fully charge the battery prior to use,
as some charge may have been lost during shipping. Unit does not need to be turned on in order for charging
to occur.
5.5 Load/Output Connection
Connect one device into each of the power receptacles supplied on the back of the UPS.
Catalog Number
SLN600
SPS850
SLN1000
SLN1500
Page: 6
Dimensions in Inches (Millimeters)
H
5.6 (142)
5.6 (142)
7.1 (180)
7.1 (180)
W
4.1 (104)
4.1 (104)
5.1 (130)
5.1 (130)
D
11.8 (300)
11.8 (300)
12.6 (320)
12.6 (320)

Hide quick links:

Advertisement

loading