Cisco ASR 920 Series Installing Manual page 24

Hide thumbs Also See for ASR 920 Series:
Table of Contents

Advertisement

Installing Patch Panel
Figure 21: Patch Panel Front View with Brackets and Guides
Figure 22: Patch Panel Rear View with Brackets and Guides
Step 5
Secure the guides to the brackets with the screws. The recommended maximum torque is 28 in.-lb (3.16 N-m).
Step 6
Position the patch panel with brackets and guide onto the rack and secure with screws provided. The
recommended maximum torque is 28 in.-lb (3.16 N-m), see the figure below.
Installing the Cisco ASR 920 Series Router
24
Installing the Cisco ASR 920 Series Router

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents