access device end, the cable insulation shall at the same time ensuring the smooth lines Leather pressed
into the terminals to avoid insulating layer and copper wire from the emergence of live wire exposed after
heating; when the old line construction, to examine the electrical circuit should be carried out to ensure
that no power lines after the construction operations.
, all electronic devices in the system must be grounded.
ment: During installation
Grounding Require
III
Need help?
Do you have a question about the DH-ITC231 and is the answer not in the manual?