SUN RUN Only the female coupler on the LAST parts. SUN RUN parts are designed to fit tensioner in the circuit can remain properly and withstand rated loads. uncoupled. All other couplers must be IMPORTANT: Hydraulic equipment must connected.
3.1.5 Releasing the pressure suddenly from the jacking up or wire stand occurs to dropping or bouncing of the loads, and it happens to personal injury. Consult SUN RUN authorized agents regarding a suitable valve to prevent that. 3.1.6 Be sure to open an air valve under operation. If not, when the working oil returns to the tank, the pressure in the tank will be increased, and the tank might be damaged.
SPE-2000RI 4. Maintain oil level Check hydraulic oil level every 30 hours of operation. Add SUN RUN approved oil when necessary. Oil level should be more than 2" from top of reservoir plate. Completely change oil at least twice a year.
Need help?
Do you have a question about the SPE-200RI and is the answer not in the manual?
Questions and answers