Before Operation; Overview: Before Operation; To Fix The User Interface To The Wall; To Insert The Batteries - Daikin Siesta ATXF50A2V1B User Reference Manual

Hide thumbs Also See for Siesta ATXF50A2V1B:
Table of Contents

Advertisement

4 Before operation

4.1 Overview: Before operation

4.2 To fix the user interface to the wall

4.3 To insert the batteries

ATXF50~71A2V1B
Daikin room air conditioner
4P513685-6C – 2019.12
This chapter describes what you have to do before operating the unit.
Typical workflow
Before operation usually consist of the following stages:
Inserting the batteries in the user interface.
Fixing the user interface to the wall.
Turning on the power supply.
a
b
a
User interface
b
Screws (field supply)
c
User interface holder
1 Choose a place where the signals reach the unit.
2 Attach the holder with screws to the wall or a similar location.
3 Hang the user interface on the user interface holder.
The batteries will last for about 1 year.
1 Remove the back cover.
2 Insert both batteries at once.
3 Put the cover back.
1
c
3
2
AAA.LR03
4
Before operation
|
User reference guide
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Siesta atxf60a2v1bSiesta atxf71a2v1b

Table of Contents